This fitting is made of ZeCor310M, featuring outstanding hightemperature resistance, oxidation resistance and corrosion resistance. It can work stably under severe service conditions such as high-temperature process, flue gas and heat treatment environments, and effectively resist high-temperature oxidation and medium corrosion.
It adopts socket welding connection. During installation, the pipe is inserted into the socket cavity of the cap and fixed by fillet welding. It is easy for installation with reliable sealing and excellent pressure bearing capacity. It covers pressure classes of 3000LB, 6000LB and 9000LB, with sizes from 1/8″ to 4″ (DN6DN100). It is widely used in petrochemical, energy, metallurgy, high-temperature process piping and instrument piping systemsShanghai Z.





1. Raw Material InspectionThe raw material is ZeCor-310M bar stock. Material certificates shall be checked, and spectrum test shall be carried out to verify chemical composition and mechanical properties. Heat number marking is required for full traceability.
2. CuttingCut billets according to drawing dimensions, remove burrs and scale on cutting surfaces, reserve allowance for forging and machining.
3. Heating and Closed Die ForgingHeat billets to specified forging temperature, form socket weld cap blanks by closed die forging, control process parameters to achieve uniform grain structure.
4. Heat TreatmentSolution treatment is performed following the dedicated procedure for ZeCor-310M to relieve forging stress and stabilize high-temperature and corrosion resistance.
5. Shot BlastingRemove scale and forging contaminants from blank surface by shot blasting.
6. Precision MachiningCNC turning and socket boring, strictly control socket diameter, socket depth and dimensional tolerance, machine chamfer to meet standard fit clearance.
7. MarkingLaser marking of material, size, pressure class, heat number and standard on fitting surface.
8. Finished Product InspectionDimensional check, visual inspection, hardness test, and PT penetrant testing as required to detect surface defects.
9. Surface TreatmentPassivation treatment to improve corrosion resistance as requested.
10. Final Inspection & Document PreparationRecheck all test items, compile MTC, test reports and inspection records.
11. Packing and WarehousingProtective packing, classified storage with full quality documents attached.