This fitting is integrally forged from ZeCor310M with dense internal structure. It features outstanding hightemperature resistance, oxidation resistance, corrosion resistance and good creep resistance, which can work reliably for a long time under severe service conditions such as high-temperature flue gas, heat treatment pipelines and high-temperature process media.
Both ends are tapered pipe threads, normally NPT threads. Sealing is realized by threaded engagement without welding. It is easy to install and convenient for later disassembly and maintenance. It covers pressure classes of 2000LB, 3000LB and 6000LB, sizes ranging from 1/8″ to 4″ (DN6-DN100). It is widely used in petrochemical, energy, metallurgy, high-temperature instrument sampling lines and high-temperature process piping systems.








1. Raw Material InspectionRaw material is ZeCor-310M bar stock. Verify material certificates, perform spectrum test for chemical composition and mechanical properties. Mark heat numbers for full traceability.
2. CuttingCut billets according to drawing dimensions, remove burrs and scale on cutting surfaces, reserve allowance for forging and machining.
3. Heating and Closed Die ForgingHeat billets to specified forging temperature, forge elbow blanks by closed die forging, control process parameters to achieve uniform and dense grain structure.
4. Heat TreatmentSolution treatment is carried out in accordance with dedicated ZeCor-310M procedure to release forging stress and stabilize high-temperature and corrosion resistance.
5. Shot BlastingRemove scale and forging contaminants from blank surface by shot blasting.
6. Precision MachiningCNC turning for NPT tapered threads, elbow profile and end faces. Strictly control thread form accuracy, thread length, center-to-end dimension and wall thickness tolerance to guarantee threaded sealing performance.
7. MarkingLaser marking of material, size, pressure class, heat number and standard number.
8. Finished Product InspectionDimensional check, visual inspection, hardness test, PT penetrant testing as required to detect surface defects.
9. Surface PassivationPassivation treatment to improve corrosion resistance.
10. Final Inspection & Document PreparationRecheck all test items, compile MTC, test reports and inspection records.
11. Packing and WarehousingProtective packing, classified storage with full quality documents attached.